Clyde & Co Blank Canvas Award: Work in Progress Photos
Ceramic brushstrokes after the first firing.
(Before glaze or colour is added). |
|
Glaze applied, going back into the kiln for second firing.
|
|
Finished brushstrokes, laid out as I start to work out arrangement
|
|
Provisional layout of ceramic, canvas, board and tape elements. (6x 3m sections)
|
|
Provisional layout of 6 x 3m sections.
|
|
Final fixings solution
Custom cut rectangular section ERW steel tubing (8mm and 4mm lengths) will be attached to the back of each piece (2 or 3 for the larger pieces) using builders grade exterior silicon sealant. An L-bracket is attached to the wall with suitable screws/fixings for plasterboard. Once attached one side is bent up to form a U shaped hook. The steel tube slots over this hook to make a neat, hidden fixing. |
|