A B I F R E C K L E T O N
  • PROJECTS
  • INFO
Clyde & Co Blank Canvas Award: Work in Progress Photos
Ceramic brushstrokes after the first firing.
(Before glaze or colour is added).

Glaze applied, going back into the kiln for second firing.
Finished brushstrokes, laid out as I start to work out arrangement
Provisional layout of ceramic, canvas, board and tape elements. (6x 3m sections)
Provisional layout of 6 x 3m sections.
Sorted into 6 sections, ready for fixings to be attached.
Picture
Final fixings solution 

Custom cut rectangular section ERW steel tubing (8mm and 4mm lengths) will be attached to the back of each piece (2 or 3 for the larger pieces) using builders grade exterior silicon sealant. 


An L-bracket is attached to the wall with suitable screws/fixings for plasterboard. Once attached one side is bent up to form a U shaped hook.


The steel tube slots over this hook to make a neat, hidden fixing.
  • PROJECTS
  • INFO